薄煤層綜采設備的研制及工藝參數優(yōu)化外文翻譯/中英文翻譯/外文文獻翻譯_第1頁
薄煤層綜采設備的研制及工藝參數優(yōu)化外文翻譯/中英文翻譯/外文文獻翻譯_第2頁
薄煤層綜采設備的研制及工藝參數優(yōu)化外文翻譯/中英文翻譯/外文文獻翻譯_第3頁
薄煤層綜采設備的研制及工藝參數優(yōu)化外文翻譯/中英文翻譯/外文文獻翻譯_第4頁
薄煤層綜采設備的研制及工藝參數優(yōu)化外文翻譯/中英文翻譯/外文文獻翻譯_第5頁
已閱讀5頁,還剩12頁未讀, 繼續(xù)免費閱讀

付費下載

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領

文檔簡介

【外文文獻】 1 The thin coal bed synthesis picks the equipment the development and the craft parameter optimization Mainly discussed the thin coal bed synthesis which Zaozhuang Mining industry Group Company independently developed to pick the equipment in Tian the Chen Kuang success application, and to its supplementary equipment technological transformations and the technical characteristic, the working surface geological condition, the synthesis picked the equipment the craft parameter optimization and the working surface working procedure reasonable match safeguard technology measure has carried on the thorough analysis and the introduction. Because the thin coal bed its mining space is narrow, the efficiency is low, the working surface condition is bad, machinery equipment not necessary or mining coal craft imperfect and so on technical questions, difficulty with realizes the mine pit highly effective and the safety in production. Zaozhuang Mining industry Group Company profits from the experience which my guozhong thick above coal bed synthesis picks, picked the supplementary equipment in the thin coal bed synthesis the development and the craft parameter optimization aspect has carried on the beneficial exploration.In October, 2003, ore 531 working surfaces equipped in its Tian the Chen has independently developed and the improvement three machines supplementary equipment, has obtained the tangible effect, realization maximum daily production 3504t, the average month produced 89636t, created the roller thin coal bed synthesis to pick the unit to yearly produce 1,000,000 ton new levels.Equips this working surface equipment fund investment is 1088.10 Yuan, the equipment does not invest into the equipment coal plow surface 1/10. First, the synthesis picks the three machines necessary and the technical characteristic (1) hydraulic pressure support According to the thin coal bed mining characteristic, uses the computer to carry on the movement analysis optimization and the intensity design to the support four link motion gears, satisfies the working condition, optimized the support structure: (1) support for the support shield type, has used the overall top-beam, two column supports has satisfied the big expansion and contraction request; (2) main structural element with the Q550 high strength structure steel plate manufacture, reduced the support weight.Front uses welds preheating, after welds the artificial aging welding craft, the guarantee structural element welding quality; (3) selects the great current capacity hydraulic pressure part, enhances the support the speed of response; (4) reasonable arrangement hydraulic circuit system, has enlarged the human, machine the space. Its development ZY2400/08/19 hydraulic pressure support technical characteristic is as follows: Two column support shield type, support 0.81.9m, support width 1.431.6m, center distance 1.5m, working resistance 2400kN, supports and protections intensity 0.410.46MPa, the adaptation inclination angle is not bigger than highly 35, opera ting mode for neighbour control, support weight 6500kg. (2) coal mining machine  Unifies thin coal bed mining the technical characteristic, has carried on the transformation to the coal mining machine following several aspects: (1) improvement design pump box, the solution gives off heat the question, satisfies the synthesis to pick the operation percentage high operating mode need;  (2) designs a group of tapering spindle rocking shaft specially, causes the drum circle diameter to reduce, increases the leaf blade altitude correspondingly, does an inside job the quantity request satisfiedly; (3) optimized drum design, increases the leaf blade spiral angle of climbing reasonably, the improvement coaling effect; (4) decreases the fuselage suitably highly (824mm), coal mining machine each big joint place has made the corresponding improvement. After the transformation coal mining machine MG200-BW2 technical characteristic is as follows: Picks high scope 1.02.0m, the adaptation inclination angle is not bigger than 35, the adaptation coefficient of hardness f3.5, drum diameter 800/1000mm, machine surface altitude 824mm, does an inside job measures 91mm, the hauling way for the non-chain hauling, biggest force of traction 250kN, hauling speed 06.14m/min, installing equipment power 200kW, voltage rank 660/1140V, machine gross weight 15t, machine total length 7858mm. (3) scraper conveyer Mainly has carried on the transformation to the scraper conveyer in following several aspects: (1) has used in the thin coal bed scraper conveyer the double strand transmission structure, loses the coal condition to be able to improve;   (2) home for the first time used middle the 22E trough section on the thin coal bed scraper conveyer, the complete machine rigidity, the intensity had enhances greatly; (3) reduces the nose, the airplane tail trough highly (is excessively 430mm), improved the coal mining machine to the nose, the airplane tail coal wall cutting condition;  (4) strengthened the shovel board, the cable tank frame, the hauling platoon has sold and so on place the joint structure. After the transformation scraper conveyer SGZ-630/220 technical characteristic is as follows: Completed length 170m, the transportation measures 450t/h, the installing equipment power 2110kW, scraper chain fast 1.07m/s, tight chain way for brake disc tight chain. Second, working surface geological condition  The development synthesis picks the equipment ore 531 working surfaces to apply for the first time in Tian the Chen, the working surface moves towards the long wall type arrangement, moves towards the length is 950m, the inclined length is 156m, coal bed thickness 0.43.0m, average 1.25m, coefficient of hardness f =2, the coal bed inclination angle 1015, average 13, reserves 283,400 t.Coal dust explosion index 31.  9%, is the strong explosive coal bed.The working surface has the mudstone false roof partially, thick 01.8m, soft easy to brave, its upside divides into the iron grey thin silicarenite, about its lower part lamination thick 1.5m for goes against directly, above for average thickness 33.5m, hard, the crevasse growth always goes against.The ledger wall partially has 0.10.4m charcoal mudstone, the direct bottom is the pessimistic siltstone, thick 2.6m, the ins and outs are the pessimistic novaculite, hard, the bedding is clear, thickness 16m. North 531 working surfaces are located five pick lower part the area, the track descends a mountain the left wing, ground table +45m, mine shaft elevation - 722m-768m, the geological condition is complex, tunneling period exposition fault 8, above in which 1.0m fault 4, the F6 reversed fault dropping variance is 4.0m, also has strip width 20m, extends the 220m wash zone along the trend to pass through the entire working surface. Third, working surface craft parameter optimization The working surface reasonable craft parameter determination, is the synthesis picks the supplementary equipment to realize the working surface high production foundation. (1) section of deep choice The overall evaluation coal mining machine power, the anthrax coefficient of hardness, coal bed thickness and pick high, the roof jointing growth situation, the support press forcing crisp coal factor definite truncation depth and so on wall depth, support supports and protections way.Through analyzes the working surface geological condition and the equipment necessary situation earnestly, the definite truncation depth is 0.6m.When roof jointing growth, cave-in of sides of a mine tunnel serious, each knife tries to break up a fight when carries on supports and protects in advance, enhances the circulation per unit area yield. (2) coal mining machine hauling speed  V determination (formula omitted) (3) supports and protections with moves a way Uses a neighbour operation, prompt supports and protections.In the mining coal machine cut from now on, first will move the support to support the roof, then will again move the conveyer.The union coal bed thickness grasping lengthening bar expands and contracts the scope, in order to and supports and protects the roof highly by the reasonable frame position.When roof situation permission, moves in turn and separates the frame to move to unify, guaranteed moves a speed to satisfy the coal mining machine coal cutting speed, realizes continuously the fast coal cutting need. (4) coal mining machine feed way Uses the MG200-BW2 coal mining machine to fall the coal, unidirectional mining coal, middle bevelling feed.The first drum shears goes against the coal, the latter drum shears the bottom coal, from notching. Fourth, working surface working procedure match safeguard measure The thin coal bed synthesis picks the working surface reasonable craft parameter the effective safeguard, mainly includes the working surface each transportation link the intercoordination and the over-load protection, the long distance communication direction, the working surface “three straight one even” and the geologic structure control measure, coal mine has used the home most advanced TK-200 communication control system for this Tian the Chen, strengthened the working surface production management, had guaranteed the working surface various working procedures best match, reduced the working surface failure rate large scale, enables the working surface operation percentage to achieve above 90%. (1) TK-200 communication control system application  (1) system composition The TK-200 communication control system by the TK110 working surface controller, the TK120 power source, the TJ100 mineral product electric current detector set, the TK130 micro telephone, the TK130C multi-purpose telephones, the TK150 intelligent terminal, the TK150E intelligence coupler and the TK130-X five core belt shield mineral product pulling force electric cable is composed. (2) system application effect  The TK-200 communication control system application, fully displays its communication control integration function, reduced the working surface equipment breakdown large scale, maximum limit has realized during various working procedures coordinated operation, raised a working surface man-hour of use factor enormously, had guaranteed powerfully the thin coal bed working surface high production is highly effective.Its application effect mainly manifests in: First, because the TK-200 communication control system has arranged 12 TK130 system telephone in the working surface, is equipped with the control bench on the electric train, between working surface all telephones and the control bench may converse on the telephone willfully, the control bench may realize the working surface all equipment common control, reduced the mechanical and electrical failure rate large scale. Second, because the working surface micro telephone can realize the working surface on all fronts to amplify along the route, therefore enormous place then personal servant party chief, the Leader Ban production control, changed the former personnel back and forth to move the direction, rocks the sending a letter number, the frontline propaganda relation way, strengthened between the working surface each production working procedure coordination and the unification, causes between various working procedures the close coordination, displays in fully the unit time the regular cycle operation validity, enhanced the working efficiency greatly. Third, because has used the common control and the working surface along the route block system, enables the working surface along the route operator only the engine off, cannot starting.If must starting, informs the control bench starting, the control bench when, must carry on the language to report to the police, and is equipped with the delay feature, avoided formerly being blind opens the vehicle to damage the electromechanical device or to create the security accident the phenomenon.If the working surface has the breakdown along the route, the operator may the rapid block system engine off, and informs all operating personnel, like this eliminates the accident in the embryonic stage, thus has guaranteed the safety in production. Fourth, TK-200 communication control system itself has provided the TJ100 electric current examination alarm device, can as necessary uninterrupted carry on the examination to the working surface electric current, once examines the operating current to surpass the setting value, then carries on reports to the police, then the operator may adjust the coal cutting speed and the reduced mining coal quantity promptly, avoided because of the pressure which overloaded creates reduction gear the accident phenomenon and so on sliding, burning the electrical machinery, damages occurrences, not only like this has facilitated the production, enhanced the efficiency, moreover reduced the material and the fitting consumption greatly. Fifth, Tian the Chen ore 531 working surface transportation lane arranges 3 belt conveyers and the slanting lane 1 scraper conveyer, transports the link to restrict the working surface operation percentage directly.After uses this system, through carefully calculates the most appropriate slanting lane scraper conveyer and the belt conveyer load, carried on to the working surface scraper conveyer operating current has reported to the police the hypothesis, thus reduced the slanting lane scraper conveyer and the belt conveyer overload and the time of idle running, not only saved the electrical energy, moreover enhanced the working surface operation percentage. (2) working surface geological condition compatibility control measure  Guarantees the working surface “straight three one even” is realizes the thin coal bed synthesis to pick the working surface regular production the effective method, when especially geologic structures and so on working surface fault or fold, the working surface equipment adapts the geological condition with difficulty, must strengthen the working surface production management, takes the effective control measure, reduces the equipment failure rate, enhances the working surface operation percentage. (1) guarantees the working surface “straight three one even” measure.  The working surface implements the back guy management; The working surface hand illumination lamps and lanterns make the frame of reference; Pushes when slides, guarantees goes against slides the hoisting jack the traveling schedule to meet the standard requirements; If the working surface appears partially time not the straight phenomenon, should move promptly or moves slides; Raises the staff operational level, the enhancement sense of responsibility. (2) working surface fault measure. Adjusts between the working surface and the fault the included angle; The coal mining machine coal cutting will be prompt from now on moves the frame, will manage the good roof; The working surface support carries on supports and protects in advance; Controls the working surface cycle to press; If the nose appears partial braves to go against time, must select promptly goes against protects goes against; The belt pressure scratches goes against moves the frame; The coal wall hits supposes the wooden anchor rod, guards against the cave-in of sides of a mine tunnel; When necessity, hangs the I-steel on the support to be throat Liang; The attention hangs Liang, prevented the support drills the bottom. (3) working surface fold measure.   The adjustment fold axial both sides slope, the government leader when is big to the both sides slope, suitably leaves a stub the coal, when the axial both sides slope is small, should the suitable broken bottom, guarantee the axial both sides slope to be gentle; Adjusts the support as necessary, prevented the support is crooked; Enhancement fold section working surface roof management. (4) prevented the scraper conveyer leaps up moves the measure. The coal mining machine driver, moves a labor, pushes sneaks off one's job should coordinate, to guarantee the working surface “straight closely three one even”; Controls the working surface top and bottom two lanes to push the progress; When the working surface support appears the incline, must square promptly; The working surface discovered when the scraper conveyer has the glide tendency, should fling the knife promptly or catch up with slides; Using the support side guard shield, adjusts the scraper conveyer, above the impediment leaps up glides down; The embedment sells or installs the hoisting jack, prevented the scraper conveyer leaps up moves; Selects the reasonable feed method, prevented on the scraper conveyer flees glides down. Fifth, conclusion (1) this set independently develops and the improvement synthesis picks the equipment the success application, has laid the solid foundation for the thin coal bed synthesis mechanization mining realization high and stable yield. Also equips this equipment fund aspect to invest is 1,088,000,000 Yuan, the equipment does not invest into the equipment coal plow working surface 1/10. (2) optimizes picks the craft parameter, strengthens the scene management, realization maximum daily production 3504t, the average month produces 89636t, created the roller thin coal bed synthesis to pick the unit to yearly produce 1,000,000 ton new levels.  (3) applied the thin coal to pick the synthesis to pick the working surface working procedure reasonable match the safeguard technology measure, has realized the working surface equipment common control, strengthened the production management, the breakdown diagnosis and the accident platoon looks up.Had guaranteed the working surface various working procedures best match, enhanced the working surface operation percentage. 【中文翻譯】 1 薄煤層 綜采設備的研制及工藝參數優(yōu)化   主要探討了棗莊礦業(yè)集團公司自行研制的薄煤層綜采設備在田陳礦的成功應用,并對其配套設備的技術改造及技術特征、工作面地質條件、綜采設備的工藝參數優(yōu)化及工作面工序合理匹配的保障技術措施進行了深入分析與介紹。  薄煤層由于其開采空間狹窄,效率低,工作面條件差,機械裝備不配套或采煤工藝不完善等技術問題,難于實現礦井的高效與安全生產。  棗莊礦業(yè)集團公司借鑒我國中厚以上煤層綜采的經驗,在薄煤層綜采配套設備的研制及工藝參數優(yōu)化方面進行了有益的探索。于 2003 年 10 月,在其田陳礦 531 工作面裝備 了自行研制與改進的三機配套設備,取得了明顯效果,實現最高日產 3504t,平均月產 89636t,創(chuàng)出了滾筒式薄煤層綜采機組年產百萬噸的新水平。裝備此工作面設備資金投入為 1088.00 萬元,設備投入不到裝備刨煤機面的十分之一。  一、 綜采三機配套及技術特征  (一 )液壓支架  根據薄煤層開采的特點,采用計算機對支架四連桿機構進行運動分析尋優(yōu)與強度設計,滿足工作條件,優(yōu)化了支架結構:  ( 1)支架為支撐掩護式,采用了整體頂梁,二柱支撐滿足了大伸縮的要求;   ( 2)主要結構件用 Q550 高強度結構鋼板制作,減輕了支架重量。采 用焊前預熱,焊后人工時效的焊接工藝,保證結構件焊接質量;  ( 3)選用大流量液壓元件,提高支架的響應速度;  ( 4)合理布置液壓管路系統,加大了人、機空間。  其研制的 ZY2400/08/19 液壓支架的技術特征如下:兩柱支撐掩護式,支撐高度 0.8 1.9m,支架寬度 1.43 1.6m,中心距 1.5m,工作阻力 2400kN,支護強度 0.41 0.46MPa,適應傾角不大于 35 ,操作方式為鄰架控制,支架重量6500kg。  (二 )采煤機  結合薄煤層開采的技術特點,對采煤機以下幾個方面進行了改造:  ( 1)改進設計泵箱, 解決發(fā)熱問題,以滿足綜采開機率高的工況需要;   ( 2)專門設計一組錐形軸搖臂,使?jié)L筒圈直徑減小,相應增大葉片高度,滿足臥底量要求;  ( 3)優(yōu)化滾筒設計,合理增大葉片螺旋升角,改善裝煤效果;  ( 4)適當減低機身高度 (824mm),采煤機各大聯結處作了相應的改進。  改造后的采煤機 MG200-BW2 的技術特征如下:采高范圍 1.0 2.0m,適應傾角不大于 35 ,適應硬度系數 f3 .5,滾筒直徑 800/1000mm,機面高度 824mm,臥底量 91mm,牽引方式為無鏈牽引,最大牽引力 250kN,牽引速度 0 6.14m/min,裝機功率 200kW,電壓等級 660/1140V,機器總重 15t,機器總長 7858mm。  (三 )刮板輸送機  對刮板輸送機主要在以下幾個方面進行了改造:  ( 1)采用了薄煤層刮板輸送機中雙鏈傳動結構,輸煤條件得以改善;   ( 2)國內首次在薄煤層刮板輸送機上采用了 22E 型中部槽型鋼,整機剛性、強度有較大提高;  ( 3)降低機頭、機尾過度槽高度(為 430mm),改善了采煤機對機頭、機尾煤壁的截割條件;   ( 4)加強了鏟板、電纜槽架、牽引排銷等處的聯接結構。  改造后的刮板輸送機 SGZ-630/220 的技術特征如 下:出廠長度 170m,輸送量 450t/h,裝機功率 2110kW ,刮板鏈速 1.07m/s,緊鏈方式為閘盤緊鏈。  二、 工作面地質條件   研制的綜采設備在田陳礦 531 工作面首次應用,工作面走向長壁式布置,走向長度為 950m,傾斜長度為 156m,煤層厚度 0.4 3.0m,平均 1.25m,硬度系數 f =2,煤層傾角 10 5 ,平均 13 ,儲量 28.34 萬 t。煤塵爆炸指數31.  9%,屬強爆炸性煤層。工作面局部有泥巖偽頂,厚 0 1.8m,松軟易冒,其上部分為灰白色細石英砂巖,其下部分層厚 1.5m 左右為直接頂,其 上為平均厚度 33.5m、堅硬、裂隙發(fā)育的老頂。底板局部有一層 0.1 0.4m 的炭質泥巖,直接底為灰色粉砂巖,厚 2.6m,老底為灰色細砂巖,堅硬,層理清晰,厚度 16m。  531 工作面位于北五采區(qū)下部,軌道下山的左翼,地面標高 +45m,井下標高-722m -768m,  地質條件復雜,掘進期間揭露斷層 8 條,其中 1.0m 以上斷層4 條, F6 逆斷層落差為 4.0m,且有一條寬 20m、沿走向延伸 220m 的沖刷帶貫穿全工作面。  三、 工作面工藝參數優(yōu)化   工作面合理工藝參數的確定,是綜采配套設備實現工作面高產的基礎。  (一 )截 深的選擇  綜合考慮采煤機功率、煤質硬度系數、煤層厚度及采高、頂板節(jié)理發(fā)育情況、支撐壓力壓酥煤壁深度、支架支護方式等因素來確定截深。通過認真分析工作面地質條件和設備配套情況,確定截深為 0.6m。當頂板節(jié)理發(fā)育、片幫嚴重時,每刀拉架時進行超前支護,以提高循環(huán)單產。  (二 )采煤機牽引速度 的確定(公式略)   (三 )支護與移架方式   采用鄰架操作,及時支護。在采煤機割過后,先移支架撐住頂板,然后再移輸送機。結合煤層厚度掌握加長桿伸縮范圍,以便以合理架位及高度支護頂板。當頂板情況允許時,順序移架與隔架移架相結合, 保證移架速度滿足采煤機割煤速度,以實現連續(xù)快速割煤的需要。  (四 )采煤機進刀方式   采用 MG200-BW2 采煤機落煤,單向采煤,中部斜切進刀。前滾筒割頂煤,后滾筒割底煤,自開缺口。  四、 工作面工序匹配的保障措施   薄煤層綜采工作面合理工藝

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論