《T/CEPPEA 5025-2023 供配電工程總承包管理規(guī)范》是針對供配電工程項目總承包管理模式制定的一套標準。該標準旨在通過規(guī)范總承包商在項目執(zhí)行過程中的行為,確保工程質量、提高效率以及保障安全。它適用于新建、擴建和改建的各類供配電工程。

根據(jù)內容劃分,本標準主要涵蓋了以下幾個方面:

  1. 總則:定義了適用范圍、術語與定義等基礎信息。
  2. 組織機構與職責:明確了總承包單位內部組織架構設置要求及其相應職責分配原則。
  3. 項目策劃:包括但不限于項目啟動前的準備活動、風險評估及應對措施規(guī)劃等內容。
  4. 設計管理:涉及設計方案審查流程、圖紙會審機制等。
  5. 采購管理:規(guī)定了物資設備選購程序、供應商評價體系等。
  6. 施工管理:強調施工現(xiàn)場安全管理、質量控制措施實施等方面。
  7. 試運行與驗收:詳細描述了系統(tǒng)調試步驟、性能測試方法以及最終驗收標準。
  8. 合同管理:涵蓋合同簽訂注意事項、變更處理方式等。
  9. 財務管理:指導成本預算編制技巧、資金使用監(jiān)管辦法等。
  10. 信息文檔管理:提出了項目過程中文件資料歸檔要求及相關信息系統(tǒng)建設建議。

此標準還特別強調了環(huán)境保護和社會責任,在整個工程建設期間需遵守相關法律法規(guī),并采取有效措施減少對周圍環(huán)境的影響。同時鼓勵采用新技術新材料以促進節(jié)能減排目標實現(xiàn)。


如需獲取更多詳盡信息,請直接參考下方經官方授權發(fā)布的權威標準文檔。

....

查看全部

  • 現(xiàn)行
  • 正在執(zhí)行有效
  • 2023-08-14 頒布
  • 2023-11-01 實施
?正版授權
T/CEPPEA 5025-2023供配電工程總承包管理規(guī)范_第1頁
T/CEPPEA 5025-2023供配電工程總承包管理規(guī)范_第2頁
T/CEPPEA 5025-2023供配電工程總承包管理規(guī)范_第3頁
T/CEPPEA 5025-2023供配電工程總承包管理規(guī)范_第4頁
T/CEPPEA 5025-2023供配電工程總承包管理規(guī)范_第5頁
已閱讀5頁,還剩39頁未讀, 繼續(xù)免費閱讀

下載本文檔

T/CEPPEA 5025-2023供配電工程總承包管理規(guī)范-免費下載試讀頁

文檔簡介

ICS27.100

CCSP60

團體標準

T/CEPPEA5025—2023

供配電工程總承包管理規(guī)范

EPCgeneralcontractmanagementspecificationforpowersupplyand

distributionengineering

2023?08?14發(fā)布2023?11?01實施

中國電力規(guī)劃設計協(xié)會發(fā)布

T/CEPPEA5025—2023

目次

前言··························································································································Ⅴ

引言··························································································································Ⅵ

1范圍·······················································································································1

2規(guī)范性引用文件········································································································1

3術語和定義··············································································································1

4工程總承包管理的組織·······························································································1

4.1通則··············································································································…1

4.2項目經理任命和項目管理機構組建·······································································…2

4.3項目部管理部職能····························································································…2

4.4項目部崗位設置及管理······················································································…2

4.5項目經理能力要求····························································································…2

4.6項目經理的職責和權限······················································································…2

5項目策劃·················································································································3

5.1通則··············································································································…3

5.2項目計劃········································································································…3

6項目設計管理···········································································································5

6.1通則··············································································································…5

6.2設計計劃········································································································…6

6.3設計實施········································································································…6

6.4設計控制與收尾·······························································································…7

7項目采購管理···········································································································8

7.1通則··············································································································…8

7.2采購工作程序··································································································…9

7.3采購計劃········································································································…9

7.4采購實施········································································································…9

7.5供應商管理····································································································…10

8項目施工和試運行管理·····························································································11

8.1通則·············································································································…11

8.2施工計劃·······································································································…12

8.3施工現(xiàn)場管理·································································································…13

8.4調試、試運行管理····························································································…15

9項目風險管理·········································································································17

9.1通則·············································································································…17

T/CEPPEA5025—2023

9.2風險識別·······································································································…17

9.3風險評估·······································································································…18

9.4風險控制·······································································································…18

10項目進度管理········································································································19

10.1通則···········································································································…19

10.2進度計劃·····································································································…19

10.3進度控制·····································································································…19

11項目質量管理········································································································20

11.1通則···········································································································…20

11.2質量計劃·····································································································…20

11.3質量控制·····································································································…21

11.4質量改進·····································································································…21

12項目費用管理········································································································21

12.1通則···········································································································…21

12.2費用計劃·····································································································…21

12.3費用控制·····································································································…22

13項目安全、職業(yè)健康、綠色建造與環(huán)境保護管理······························································22

13.1通則···········································································································…22

13.2安全管理·····································································································…23

13.3職業(yè)健康管理·······························································································…24

13.4綠色建造與環(huán)境保護管理················································································…24

14項目資源管理········································································································25

14.1通則···········································································································…25

14.2人力資源管理·······························································································…25

14.3工程材料與設備管理······················································································…25

14.4施工機具與設施管理······················································································…26

14.5技術管理·····································································································…26

14.6資金管理·····································································································…27

15項目溝通與信息管理·······························································································27

15.1通則···········································································································…27

15.2信息安全及保密····························································································…27

15.3文件管理·····································································································…28

16項目合同管理········································································································28

16.1通則···········································································································…28

16.2總承包合同管理····························································································…28

16.3分包合同管理·······························································································…29

T/CEPPEA5025—2023

16.4物資采購合同·······························································································…30

17項目接口管理········································································································31

17.1通則···········································································································…31

17.2設計與采購的重要內部接口·············································································…31

17.3設計與施工(含試運行)的重要內部接口······························································…31

17.4采購與施工的重要內部接口·············································································…32

18項目收尾··············································································································32

18.1通則···········································································································…32

18.2竣工驗收·····································································································…32

18.3項目結算·····································································································…33

18.4考核與審計··································································································…33

18.5項目保修·····································································································…33

18.6項目總結與評價····························································································…34

參考文獻····················································································································35

T/CEPPEA5025—2023

前言

本文件按照GB/T1.1—2020《標準化工作導則第1部分:標準化文件的結構和起草規(guī)則》的規(guī)定

起草。

請注意本文件的某些內容可能涉及專利。本文件的發(fā)布機構不承擔識別專利的責任。

本文件由中國電力規(guī)化設計協(xié)會提出并歸口。

本文件起草單位:上海電力設計院有限公司、天津電力設計院有限公司、北京電力經濟技術研究院

有限公司、佛山電力設計院有限公司。

本文件主要起草人:程珽、潘必斌、徐何君、邵楚雯、沙溢、高海濤、徐月斌、劉慨然、耿軍偉、李瀟、張

鵬、董麗、劉艷民、賴景飛、趙磊。

T/CEPPEA5025—2023

引言

為規(guī)范供配電建設項目工程總承包管理過程和活動,提高工程總承包管理水平,推進工程總承包

管理與國際接軌,特制定本文件。

本文件為電力勘測設計行業(yè)工程總承包企業(yè)在開展供配電工程總承包項目管理時遵照執(zhí)行的新

編團體標準。

本文件在編寫過程中,遵照了有關工程建設和項目管理的國家標準,調研了電力勘測設計行業(yè)供

配電項目工程總承包管理的現(xiàn)狀和實踐,汲取了其他行業(yè)工程總承包管理的經驗和做法。

溫馨提示

  • 1. 本站所提供的標準文本僅供個人學習、研究之用,未經授權,嚴禁復制、發(fā)行、匯編、翻譯或網(wǎng)絡傳播等,侵權必究。
  • 2. 本站所提供的標準均為PDF格式電子版文本(可閱讀打?。?,因數(shù)字商品的特殊性,一經售出,不提供退換貨服務。
  • 3. 標準文檔要求電子版與印刷版保持一致,所以下載的文檔中可能包含空白頁,非文檔質量問題。

評論

0/150

提交評論