




已閱讀5頁(yè),還剩48頁(yè)未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
KYN28-12鎧裝式金屬封閉開(kāi)關(guān)設(shè)備安裝使用與維護(hù)手冊(cè)Metal-clad enclosed SwitchgearInstruction manualXXXXXXXX有限公司XXXXXXXXXXXXXXXX, LTD., P. R. CHINA始終安全第一Your safety first-always!在開(kāi)關(guān)設(shè)備安裝使用前請(qǐng)先仔細(xì)閱讀本說(shuō)明書(shū) Thats why our instruction manual begins with these recommendations開(kāi)關(guān)設(shè)備只能安裝在適合于電氣設(shè)備工作的戶內(nèi)場(chǎng)所。Only install switchgear and/or switchboards in enclosed rooms suitable for electrical equipment.確保由專職電氣人員進(jìn)行安裝、操作和維護(hù)。Ensure that installation,operation and maintenance are carried out by specialist electricians only.必須保證現(xiàn)場(chǎng)電氣設(shè)備的聯(lián)接條件和工作規(guī)程的適用和安全性。Comply in full with the legally recognized standards(DIN VDE/IEC),the connection conditions of the local electrical utility and the applicable safety at work regulations.有關(guān)開(kāi)關(guān)設(shè)備的一切操作,都要遵守說(shuō)明書(shū)中的相應(yīng)規(guī)定。 Observe the relevant information in the instruction manual for all actions involving switchgear and switchboards.危險(xiǎn)Danger要特別注意說(shuō)明書(shū)中標(biāo)有這個(gè)危險(xiǎn)標(biāo)志的注意事項(xiàng)。Pay special attention to the hazard notes in the instruction manual marked with this warning symbol.不要超出開(kāi)關(guān)設(shè)備在正常工作條件下的技術(shù)參數(shù)里規(guī)定的負(fù)載。Make sure that under operation condition of the switchboard the specified data are not exceeded.說(shuō)明書(shū)應(yīng)放在所有與安裝、操作和維護(hù)有關(guān)人員能方便地拿到的地方。Keep the instruction manual accessible to all persons concerned with installation, operation and maintenance.用戶的專職人員應(yīng)對(duì)所有影響工作安全的事項(xiàng)負(fù)責(zé),并正確管理開(kāi)關(guān)設(shè)備。he users personnel are to act responsibly in all matters affecting safety at work and the correct handing of the switchgear.若對(duì)本說(shuō)明書(shū)尚有疑問(wèn),我們將很樂(lè)意提供進(jìn)一步的資訊。If you have any further questions on this instruction manual, the members of our field organization will be pleased to provide the required information.文檔由本人精心搜集和整理,喜歡大家用得上,非常感謝你的瀏覽與下載。凡本廠職工應(yīng)熱愛(ài)電廠、熱愛(ài)崗位、熱愛(ài)本職工作,發(fā)揚(yáng)“團(tuán)結(jié)務(wù)實(shí)、爭(zhēng)創(chuàng)一流,立足崗位,愛(ài)廠敬業(yè),盡職盡責(zé),不斷提高工作質(zhì)量和工作效率,圓滿完成各項(xiàng)生產(chǎn)和工作任務(wù),為華能的建設(shè)和發(fā)展作出貢獻(xiàn)2019整理的各行業(yè)企管,經(jīng)濟(jì),房產(chǎn),策劃,方案等工作范文,希望你用得上,不足之處請(qǐng)指正目錄頁(yè)碼1.總則61.1概述61.2標(biāo)準(zhǔn)和規(guī)范61.3工作條件61.3.1正常工作條件71.3.2特殊工 特殊工作條件71.3.3注意事項(xiàng)82技術(shù)數(shù)據(jù)82.1電氣參數(shù)82.2耐內(nèi)部故障電弧性能92.3外形尺寸和重量103結(jié)構(gòu)概述123.1基本結(jié)構(gòu)123.2外殼和隔板133.3開(kāi)關(guān)柜內(nèi)的小室133.4防止誤操作的聯(lián)鎖/保護(hù)164運(yùn)輸和保管204.1交付條件204.2包裝204.3運(yùn)輸214.4交貨和中間保管225開(kāi)關(guān)柜的現(xiàn)場(chǎng)安裝245.1安裝現(xiàn)場(chǎng)的一般要求245.2配電室平面布置基本方案245.3基礎(chǔ)255.3.1以配電室地板作為基礎(chǔ)255.3.2在混凝土地坪上的基礎(chǔ)框架265.4開(kāi)關(guān)柜的安裝與拼接275.5母線的安裝聯(lián)接295.6電力電纜和控制電纜的聯(lián)接305.7接地銅排的聯(lián)接315.8安裝工作的收尾32目錄頁(yè)碼6 開(kāi)關(guān)柜的運(yùn)行376.1起動(dòng)376.1.1準(zhǔn)備工作376.1.2起動(dòng)396.2開(kāi)關(guān)柜的操作406.2.1斷路器手車406.2.2斷路器426.2.3接地開(kāi)關(guān)436.2.4電纜室門446.2.5電氣/機(jī)械的指示/監(jiān)控447維護(hù)457.1概述457.2檢查和保養(yǎng)467.3修理497.3.1一般性修理497.3.2更換元件497.4備件49 版權(quán)所有,禁止將本說(shuō)明書(shū)的全部或部分,以任何形式提供給第三者。公司保留對(duì)提供的數(shù)據(jù)和圖解的更改權(quán)力,需更改時(shí),不另行通知。Contents11.11.21.31.311.3.21.3.322.12.22.333.13.23.33.444.14.24.34.455.15.25.35.315.325.45.55.65.75.8Summary GeneralStandards and specificationsService conditions Normal Service conditions Special Service conditionsMatters need attentionTechnical dataSwitchgear electrical dataReceived internal arc natureDimension and weightsStructure summary Basic structure and variantsEnclosure and partitionsCompartments in the switchgear panelsInterlocks/protection against mishandlingDespatch and storageCondition on deliverPackagingTransportDelivery and intermediate storageAssemblage of the switchgear at siteGeneral site requirementsBasic scheme of switching rooms play layout.FoundationFoundation as the floorboard of switching room.Foundation frame on a concrete floorInstalment and joint of switchgearInstalment and joint of bus barContact of power cable and control cable.Join of the earth bus barThe epilogue of erecting workPage666677888910121213131620202021222424242525262729303132Contents66.16.1.16.1.26.26.2.16.2.26.2.36.2.46.2.577.17.27.37.3.17.3.27.4Switchgear runningStart-upPreparation workStart-upOperation of the switchgearVCB truckVCBEarth switchCable doorElectrical/mechanical indicate/monitorMaintenanceGeneral Checking and maintenance MaintenanceCheckingChange elementSpares*The data and illustrations are without engagement .Subject to change without notice.Page3737373940404243444445454649494949We reserve all rights to this publication. Misuse, particularly including duplication and making available of this manual extracts-to third parties is prohibited. The information supplied isnt liability,subject to approval.1 總則 Summary1.1 概述 GeneralKYN28-12鎧裝式金屬封閉開(kāi)關(guān)設(shè)備(以下簡(jiǎn)稱KYN28-12開(kāi)關(guān)柜)適用于三相交流50Hz、7.212kV單母線及單母線分段電力系統(tǒng),具有“五防”功能。開(kāi)關(guān)柜的可移開(kāi)部分可配置真空斷路器和真空接觸器等元器件。KYN28-12 metal-clad enclosed switchgear is suitable for 3-phase AC 50Hz/7.2-12kV single bus bar and single bus bar section electric power system.,with the function of “five preventions”. The removing compartment of the switchgear may be assembled with vacuum circuit breaker and vacuum contactor etc.1.2 標(biāo)準(zhǔn)和規(guī)范 Standards and specificationsKYN28-12開(kāi)關(guān)柜滿足IEC298,GB3906,DL404等標(biāo)準(zhǔn)。The switchgear complies with the standards of IEC60298,GB3906,DL404 etc.開(kāi)關(guān)柜外殼的防護(hù)等級(jí)為IP4X,當(dāng)斷路器室門打開(kāi)、手車移開(kāi)時(shí),防護(hù)等級(jí)為IP2X。 Enclosure protection degree of switchgear is IP4X, protection degree is IP2X when the door of VCB room is open and the truck is be drew out.在系統(tǒng)的安裝和運(yùn)行期間,要遵守所有相關(guān)的IEC規(guī)范及國(guó)家或地方相關(guān)的安全導(dǎo)則,還應(yīng)考慮江蘇長(zhǎng)江電器股份有限公司提供的有關(guān)資料。During the installation and running of electric system, observe all the relevant information in the IEC and the safety regulations in GB or local electrical utility, and consider the relevant information provided by JIANGSU CHANGJIANG ELECTRIC CO.,LTD.,P.R.CHINA.1.3工作條件Service conditions1.3.1 正常工作條件 Normal service conditionsKYN28-12開(kāi)關(guān)柜正常工作條件如下:Normal service conditions of switchgear following:室內(nèi)環(huán)境溫度:Ambient temperature in room:最高溫度 +40CMaximum日平均值不大于 +35CMaximum 24 hour average最低溫度 -15CMinimum (according to “minus 15 indoor class”)室內(nèi)環(huán)境濕度:Ambient humidity in room: 日平均相對(duì)濕度 95%及以下Daily average relative humidity less than 95%月平均相對(duì)濕度 90%及以下Monthly average relative humidity less than 90%安裝場(chǎng)所的海拔高度 1000m及以下Height above sea level at site less than 1000m地震烈度: 不超過(guò)8度Earthquake intensity: less than 8 degree沒(méi)有火災(zāi)、爆炸危險(xiǎn),沒(méi)有嚴(yán)重污穢及化學(xué)腐蝕的場(chǎng)所。This product should not be used under conditions of fire, explosion,earthquake and chemical corrosion environments.1.3.2特殊工作條件Special service conditions對(duì)特殊工作條件,必須向制造廠咨詢。制造廠與用戶應(yīng)就特殊工作條件取得一致意見(jiàn)。The manufacture must be consulted in advance about each special service condition. Special service conditions are to be agreed on by the manufacturer and user. l 已考慮安裝場(chǎng)所的海拔高于1000m時(shí),空氣介質(zhì)強(qiáng)度的降低對(duì)絕緣水平的影響。Allow for the reduction in the dielectric strength of the air when site altitude is over 1000ml 若環(huán)境溫度超出極限值,在母線和分支母線的設(shè)計(jì)上加以補(bǔ)償或限制載流量。在柜內(nèi)安裝通風(fēng)裝置將有利于開(kāi)關(guān)柜的散熱。If the ambient temperature is over top of the high-point, must consider equalizing or limiting current capacity for the design of main bus bar and branching bus bar. Installation the aerator is favor of rejection of heat.1.3.3 注意事項(xiàng):Matters need attention:若開(kāi)關(guān)柜運(yùn)行地區(qū)的濕度較高,溫度波動(dòng)速度較快且幅度較大,開(kāi)關(guān)柜在這種氣候環(huán)境下運(yùn)行,就有凝露的危險(xiǎn),因此開(kāi)關(guān)柜在備用和運(yùn)行狀態(tài)下,用戶應(yīng)保證加熱器全天侯投入!但在大電流運(yùn)行中,可以不投入。If the humidity is higher on site, temperature fluctuations speed is rapidder and range is bigger, condensation phenomena will be appear for the switchgears running in this clime condition, so user should ensure that the heater running full time on spare and running condition! But running in high-current, the heater can stop. 2技術(shù)數(shù)據(jù) Technical data2.1 開(kāi)關(guān)柜電氣參數(shù) Switchgear technical data額定電壓kV12額定絕緣水平1min工頻耐壓(有效值)kV42雷電沖擊耐壓(峰值)kV75額定頻率Hz50主母線額定電流A630,1250,1600,2000,2500,3150,4000分支母線額定電流A630,1250,1600,2000,2500,3150,4000*4秒熱穩(wěn)定電流(有效值)kA16,20,25,31.5,40*額定動(dòng)穩(wěn)定電流(峰值)*kA40,50,63,80,100Rated voltage kV12Rated power-frequency withstand voltage(1min)kV42Rated lightening impulse withstand voltagekV75Rated frequencyHz50Rated main bus bar current A1600,1200,2500,3150,4000Rated branching bus bar currentA630,1250,1600,2000,2500,3150,4000*4s Short-time withstand current(rms.)kA16,20,25,31.5,40Peak withstand current(peak.)kA40,50,63,80,100,125*需裝備通風(fēng)裝置 with forced ventilation.*40 kA為3秒 3 second for 40kA*儀用互感器的短路容量應(yīng)單獨(dú)考慮 The short-circuit capability of transformer for measure should be considered by oneself.2.2 耐內(nèi)部故障電弧性能 Performance bearing inside fault arcKYN28-12開(kāi)關(guān)柜在設(shè)計(jì)上已考慮到開(kāi)關(guān)柜內(nèi)部故障電弧的問(wèn)題,根據(jù)GB3906和IEC298進(jìn)行了嚴(yán)格的試驗(yàn),能有效地保證設(shè)備及操作人員的安全。KYN28-12 has been considered with the problem of inside fault arc in switchgear on design. It is tested strictly according to GB3906 and IEC298, thus ensure effectively the safety of equipments and operation personnel.2.3外形尺寸和重量 Outline dimensions and weight 外形尺寸 Outline dimensions高度a (mm) 2200寬度b (mm)分支母線額定電流為1250A及以下,短路開(kāi)斷電流為31.5kA及以下 800/650*分支母線額定電流為1600A及以下,短路開(kāi)斷電流為40kA 800分支母線額定電流為1600A及以上 1000深度c (mm) 1350/1500Height a 2200(mm) Width b Rated branching bus bar current up to 1250A,Rated short-circuit breaking current(rms.) up to 31.5KA 800/650*(mm)Rated branching bus bar current up to 1600A,Rated short-circuit breaking current(rms.) up to 40KA 800 (mm)Rated branching bus bar current over 1600A, 1000(mm)Depth c 1350/1500 (mm) 重量8001200kg,詳細(xì)資料見(jiàn)表1。*配VD4斷路器可用。Weight 8001200kg,for table 1showing.*Suitable for VD4 being equipped.表1 安裝要求的尺寸及柜體重量柜內(nèi)設(shè)備型式移開(kāi)式移開(kāi)式移開(kāi)式柜深 c柜寬 b距墻距離mmmmmm150065080015008001000150010001200走廊寬度*mm100011001200安裝通道(室內(nèi)通道要求)寬度長(zhǎng)度(深)門框要求寬度高度mmmmmmmm10001500800220010001500100022001200150012002200重量(近似值)地坪承重kgkg/m28001000850100012001000List 1 Dimension and weight for switchgear installationMode of devicein switchgearRemovingtypeRemovingtypeRemovingtypedepth cWidth bDistance to wallmmmmmm1500650501500800501500100050The width of Passage *mm100011001200Assemble walkwayDemand of passage indoorWidthLength(Depth)Demands of door frameWidthHeight*mmmmmmmm10001500800200010001500100022001200150012002200Mass(approximation)Weight terrace bearedkgkg/m28001000850100012001000*取決于最大柜寬Depend on the most width of the switchgear.3 開(kāi)關(guān)柜結(jié)構(gòu)概述Structure general of switchgear3.1基本結(jié)構(gòu)(圖3/1)Basic structure(Figure3/1)開(kāi)關(guān)柜由固定的柜體和真空斷路器手車組成,這是它的基本結(jié)構(gòu)。開(kāi)關(guān)柜及安裝的電氣元件見(jiàn)圖3/1。進(jìn)線柜或出線柜是基本柜方案,并有派生方案,如母線分段柜或計(jì)量柜等。此外,尚有配置固定式負(fù)荷開(kāi)關(guān)、真空接觸器手車、隔離手車等方案。開(kāi)關(guān)柜靠墻或面對(duì)面安裝。結(jié)構(gòu)細(xì)節(jié)和柜內(nèi)安裝設(shè)備,可見(jiàn)訂貨文件。The basic structure of switchgear panel comprises the panel itself a removing part. The panel and main components can see in figure 3/1.Incoming-line panel or outgoing-line panel are diagram of basic switchgear panel,there are other derivative diagram,for example ,contact panel or metering panel .in addition,There are so many diagram of the switchgear panel with stationary type load switch、(SF6)VCB truck、VC truck、Disconnect truck. The panel has two maintenance modes. That is single-face maintenance and double-face maintenance. The detail of structure and main components, can reference order document.3.2外殼和隔板 Enclosure and clapboard開(kāi)關(guān)柜的外殼和隔板由優(yōu)質(zhì)鋼板制成,具有很強(qiáng)的抗氧化、耐腐蝕功能,且剛度和機(jī)械強(qiáng)度比普通低碳鋼板高。三個(gè)高壓室的頂部都裝有壓力釋放板。出現(xiàn)內(nèi)部故障時(shí),高壓室內(nèi)氣壓升高,由于柜門已可靠密封,高壓氣體將沖開(kāi)壓力釋放板釋放出來(lái)。相鄰的開(kāi)關(guān)柜由各自的側(cè)板隔開(kāi),拼柜后仍有空氣緩沖層,可以防止開(kāi)關(guān)柜被故障電弧貫穿熔化。低壓室D裝配成獨(dú)立隔室,與高壓區(qū)域分隔開(kāi)。隔板將斷路器室B和電纜室C隔開(kāi),即使斷路器手車移開(kāi)(此時(shí)活門會(huì)自動(dòng)關(guān)閉),也能防止操作者觸及母線室A和電纜室C內(nèi)的帶電部分。卸下緊固螺栓就可移開(kāi)水平隔板,便于電纜密封終端的安裝。The enclosure and clapboard of the switchgears is made up from high quality steel, have very strong function to resistant oxidation and corrosion, and its rigidity and mechanical robustness is higher than common low-carbon steel board. Have been installed release of pressure plate on the top of three high-pressure chambers. When appear internal fault electric arc, air pressure heightens in high-pressure chamber, because that the doors of switchgear is already airtight coating, the pressure gas will clash out the release of pressure plat. Adjacent switchgears are isolated by its self side board, after putting the switchgears together, air buffer layer exist yet, it may prevent the switchgears from pronging and melted by electric arc. Low-voltage vault D is separate room with high-pressure area. Clapboard space isolate the VCB vault B with cable vault C, even if VCB. truck is moved(here the valve is closed self-motion),can prevent the operator from touching the electrification parts of bus bar vault A and cable vault C. releasing the tighten bolt, the level clapboard is removed, convenient for installation of cable seal terminal.3.3開(kāi)關(guān)柜內(nèi)的小室 Compartments in switchgear斷路器室(見(jiàn)附圖3/1,3/3,3/5,3/6)VCB vault (figure 3/1,3/3,3/5,3/6 showing)斷路器手車裝在有導(dǎo)軌的斷路器室B內(nèi),可在運(yùn)行、試驗(yàn)/隔離兩個(gè)不同位置之間移動(dòng)。當(dāng)手車從運(yùn)行位置向試驗(yàn)/隔離位置移動(dòng)時(shí),活門會(huì)自動(dòng)蓋住靜觸頭,反向運(yùn)行則打開(kāi)。手車能在開(kāi)關(guān)柜門關(guān)閉的情況下操作,通過(guò)門上的觀察窗可以看到手車的位置、手車上的ON(斷路器合閘)/OFF(斷路器分閘)按鈕、合分閘狀態(tài)指示器和儲(chǔ)能/釋放狀況指示器。VCB truck is installed in VCB vault B with track, may move in the middle of the position to service and test/disconnected. While the truck move from service position to test/disconnected position, the valve can cover un-move contact in self-motion, open when moving reverse. The truck can be operated when the truck vault door is closed, while you can watch the position of the truck, on (VCB tripping)/off(VCB closing) push knob in the truck, close and open indicator and charging/releasing indicator by inspection window. 斷路器手車 VCB truck手車可采用手動(dòng)進(jìn)行移動(dòng)??蚣苡珊辖痄摪迤囱b而成,上面裝斷路器和其他設(shè)備。具有彈簧觸頭系統(tǒng)的觸臂裝在斷路器的極柱上,當(dāng)手車插入到運(yùn)行位置時(shí)起電氣聯(lián)接作用。手車于開(kāi)關(guān)柜之間的信號(hào)、保護(hù)和控制線,用一個(gè)控制線插頭聯(lián)接。手車剛插入開(kāi)關(guān)柜就固定在試驗(yàn)/隔離位置,同時(shí)也可靠地聯(lián)接到開(kāi)關(guān)柜的接地系統(tǒng)。手車的所在位置,能通過(guò)觀察窗或裝在低壓室面板上的手車電氣位置指示器看到。除真空斷路器外,手車可配真空接觸器、隔離裝置和計(jì)量設(shè)備等。The truck can be moved by manual. The structure of the truck is made of the steel, the VCB and other equipments are installed on top of it. The arm of spring bush is installed on the pillar of the VCB,When the truck is pushed on the service position, it has the effect of electrical interlocking. The signal 、protection、control line between the truck and the switchgear is connection with the pin of control line. The truck is fixed on the test position as soon as it is pushed into the switchgear, and be connection to the earth system of the switchgear. The position of truck will be seen by the lamp that is installed on the looking window or the panel of low-voltage.Beside the VCB, the Truck can be equipped the vacuum contactor 、isolated device and the measuring equipment.母線室 Bus bar compartment母線從一個(gè)開(kāi)關(guān)柜引至另一個(gè)開(kāi)關(guān)柜,通過(guò)分支母線和套管固定。矩形的分支母線直接用螺栓聯(lián)接到主母線上,不需任何聯(lián)接夾。所有母線和分支母線都用熱縮套管覆蓋。套管板和套管將柜與柜之間的母線隔離起來(lái),并有支撐作用。對(duì)電動(dòng)應(yīng)力大的開(kāi)關(guān)柜,一般需要這種支持。The bus bar from one switchgear to the other switchgear is fixed with the bushing and the ramus bus .The ramus bus is connection to the main bus with the bolt, it neednt any clip. All bus and the ramus bus are covered with pyrocondensation bushing. The panel of bushing and bushing are isolated between the switchgear and the switchgear. And it has the effect on supporting.電纜室(圖3/1)Cable compartment(drawing 3/1)電流互感器和接地開(kāi)關(guān)裝在電纜室后部。電纜室也可安裝避雷器。當(dāng)電纜室門打開(kāi)后,有足夠的空間供施工人員進(jìn)入柜內(nèi)安裝電纜(最多可并接6根)。蓋在電纜入口處的底板可采用非導(dǎo)磁的不銹鋼板,是開(kāi)縫的,可拆卸的,便于現(xiàn)場(chǎng)施工。底板中穿越一、二次電纜的變徑密封圈開(kāi)孔應(yīng)與所裝電纜相適應(yīng),以防小動(dòng)物進(jìn)入。對(duì)于濕度較大的電纜溝,建議用防火泥、環(huán)氧樹(shù)脂將開(kāi)關(guān)柜進(jìn)行密封。CT and earth switch are installed on the back of the Cable Compartment. The Surge arrester is also installed on the Cable Compartment. When the truck and the horizontal panel are moved .There is enough room so that the worker install the cables (the most is 6).The bottom of panel that lie on the incoming of cable in made of the stainless steel panel,It is uncork, disassembly so that working on the local. The airplane of panel where is together secondary cable make sure as same as the installed cable prevent the small animal being into it.For the cable trench in humidity,It is suggested that the switchgear is airproofed with fireproofing mud and epoxide resin.低壓室(圖3/1、3/2) Low-voltage compartment (figure 3/1、3/2)開(kāi)關(guān)柜的二次元件裝在低壓室內(nèi)及門上??刂凭€線槽空間寬裕,并有蓋板,左側(cè)線槽用來(lái)引入和引出柜間連線,右側(cè)線槽用來(lái)敷設(shè)開(kāi)關(guān)柜內(nèi)部連線。低壓室側(cè)板上有控制線穿越孔,以便控制電源的聯(lián)接。Low-voltage components of switchgear are installed in low-voltage compartment and on door. Control wiring trunking has ample space and cover board. Nearside wiring trunking is used to introduce and educe the wiring between switchgears, starboard wiring trunking is used to lay intramural wiring in switchgear. Traversing hole for control wiring on side board in low-voltage compartment is used to connect with control power supply.3.4防止誤操作的聯(lián)鎖/保護(hù) Interlocks/protections for preventing mishandling具備一系列的聯(lián)鎖裝置,從根本上防止出現(xiàn)危險(xiǎn)局面和可能引起嚴(yán)重后果的誤操作,因此有效地保護(hù)了操作人員和開(kāi)關(guān)柜。聯(lián)鎖裝置地功能如下:A series of interlocks are provided to prevent mishandling, thus protecting both personnel and switchgear itself. The function of interlocks is following: 斷路器和接地開(kāi)關(guān)在分閘位置時(shí),手車能從試驗(yàn)/隔離位置移動(dòng)到運(yùn)行位置
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 安全教育培訓(xùn)體系構(gòu)建
- AI內(nèi)部培訓(xùn)課件
- 教育學(xué)論文題目大全
- 管理學(xué)小論文
- 評(píng)價(jià)自己的健康狀況教學(xué)反思
- 管焊工安全培訓(xùn)課件
- 研究生的自我總結(jié)
- 中職婦科護(hù)理教學(xué)課程
- 動(dòng)漫制作培訓(xùn)
- 小學(xué)竹編非遺課件
- PCBA元件焊點(diǎn)強(qiáng)度推力測(cè)試標(biāo)準(zhǔn)
- 食用菌的保鮮技術(shù)研究進(jìn)展
- 可持續(xù)建筑(綠色建筑)外文翻譯文獻(xiàn)
- 2023年春國(guó)家開(kāi)放大學(xué)工具書(shū)與文獻(xiàn)檢索形考任務(wù)1-4及答案
- 2023年03月北京海淀區(qū)衛(wèi)生健康委所屬事業(yè)單位招聘430人(第一次)筆試參考題庫(kù)含答案解析
- ISTA-3A(中文版)運(yùn)輸-試驗(yàn)標(biāo)準(zhǔn)
- 小學(xué)科學(xué)-蠶變了新摸樣教學(xué)課件設(shè)計(jì)
- 企業(yè)資產(chǎn)評(píng)估工作底稿模版
- 人教版五年級(jí)下冊(cè)分?jǐn)?shù)的基本性質(zhì)說(shuō)課稿
- 市場(chǎng)監(jiān)督管理局企業(yè)注冊(cè)、經(jīng)營(yíng)范圍登記規(guī)范表述:行業(yè)分類及條目代碼
- 廣西大學(xué)宏觀經(jīng)濟(jì)學(xué)期末復(fù)習(xí)題及參考答案
評(píng)論
0/150
提交評(píng)論