




已閱讀5頁(yè),還剩4頁(yè)未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
STANDARD OPERATING PROCEDURESSOP-ME-OOTESTING,INSPECTION AND HAND OVERRef. No.ContentsSOP-ME-01M&E Testing and Hand over InspectionSOP-ME-02Hand Over of List Motor RoomSOP-ME-03Inspection for FSBSOP-ME-04Defects Liabiltiy Period ActivitesSOP-ME-05Water Tightness between UPVC and RC slabSOP-ME-06Sterilisation of water tankPARK HYATT SAIGON HOTEL PROJECTSTANDARD OPERATION PROCEDURE NO SOP ME -01 ( Page 1 / 2 ) WORK TITLE :M & E Testing and Handover Inspection APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/10/97WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIATo comply with the specification REFERENCE STANDARDS/ CODES & QUALITY PLAN :To comply with PUB, IEE regulationFACILITIES /INSPECTION INSTRUMENT : Testing equipment for respective trades ENVIRNMENT CONTROLS :NANECESSARY RECORM & E shop drawings FREQUENCY :Before handover inspection SPECIAL REQUIREMENTS : Testing to be carried out by M & E Engineer SAFETY & HEALTH REQUIREMENTS :Standard PPE WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 1.To ensure the installation work is fully completed on site as per the approved drawing2.to conduct the M & E functional test as per the specification3.To ensure the defects are rectified accordingly4.To ensure the M & E plant room is clean up and apply for the coat of painting 5.Wiring diagramme/colour schedule is properly framded and hanged in respective plant room As per the approved shop drawingTest to the specificationTest to the specificationNAAs per the drawing Re do the installationRe-testRe-testRe-paint Re-do the diagramme FFFFCCCCCPPPPPPFile : ME - 01 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ME -01 ( Page 2 / 2 ) WORK TITLE :M & E Testing and Handover Inspection APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/10/97WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 6. To prepare the as-built M & E drawing for handover inspection 7.To prepare the operation instruction and manual for maintenance As per the installationAs per the contract Re- do the drawing NA FFCCPPFile : ME - 01 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ME -02 ( Page 1 / 2 ) WORK TITLE :Hand over of Lift Motor Room APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/10/97WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIATo comply with the specification REFERENCE STANDARDS/ CODES & QUALITY PLAN :To comply with PUB, IEE regulationFACILITIES /INSPECTION INSTRUMENT : NA ENVIRNMENT CONTROLS :NANECESSARY RECORM & E shop drawings FREQUENCY :Before handover SPECIAL REQUIREMENTS : NA SAFETY & HEALTH REQUIREMENTS :Standard PPE WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 1.To ensure the necessary opening for cables through floor slab conform to drawings 2.Lift motor plinth to be completed 3.Hoisting hook for lifting of motor in place 4.Electrical supply for lift motor and panel to be completed 5.Lighting and switch socket outlet to be completed By visual inspection ( refer to approved shop drawing )By visual inspection ( refer to approved shop drawing ) By visual inspection ( refer to approved shop drawing ) By visual inspection ( refer to approved shop drawingBy visual inspection ( refer to approved shop drawingTo rectify To rectifyTo rectifyTo rectifyTo rectifyFFFCCCCCPPPPPFile : ME - 02 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ME -02 ( Page 2 / 2 ) WORK TITLE :Hand over of Lift Motor Room APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/10/97WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 6.Signal cable from FIB panel to lift motor panel to be in place ( if required )7. Signal cable from generator set Distribution Board to lift motor panel to be in place ( if required )8.Doors to install with locks9.painting to walls and ceiling 10.Ventilation process to be in place ( Louvre or mechanical ventilation )11.Screeding to floor to be completed after installation of lift motor panel and trunking By visual inspection ( refer to approved shop drawing ) By visual inspection ( refer to approved shop drawing )By visual inspection ( refer to approved shop drawing )By visual inspection ( refer to approved shop drawing )By visual inspection ( refer to approved shop drawing )To rectify To rectifyTo rectifyTo rectifyTo rectifyCCCCCPPPPPFile : ME - 02 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ME -03 ( Page 1 / 1 ) WORK TITLE :Inspection for FSB APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/10/97WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIATo comply with the specification REFERENCE STANDARDS/ CODES & QUALITY PLAN :To comply with FSB s requirement FACILITIES /INSPECTION INSTRUMENT : NAENVIRNMENT CONTROLS :NANECESSARY RECORDSSubcontractor should submit all the relevant forms to the Authority for inspection FREQUENCY :Before completion of the project SPECIAL REQUIREMENTS : NASAFETY & HEALTH REQUIREMENTS :Standard PPE WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers Preparation before test 1.All lifts to be sent to various floor 2.Generator set to normal 3.Relavant monitoring authorities to be informed of testing By visual inspection By visual inspection By visual inspection To adjust To adjustTo adjust FFFCCCPPPFile : ME - 03 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ME -04 ( Page 1 / 1 ) WORK TITLE :Defects Liability Period Activities APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/10/97WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIATo comply with the specification REFERENCE STANDARDS/ CODES & QUALITY PLAN :To comply with FSB s requirement FACILITIES /INSPECTION INSTRUMENT : According to the maintenance programme ENVIRNMENT CONTROLS :NANECESSARY RECORDSMaintenance record FREQUENCY :Maintenance programme SPECIAL REQUIREMENTS : NASAFETY & HEALTH REQUIREMENTS :Standard PPE WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 1.Full operation, manual, drawing should be kept for information2.Maintenance team to be set up for the maintenance work3.Maintenace programme for all equipment installed shall be followed up accordingly4.Consumable materials /spare parts shall be kept for maintenance work as per the contract e,g fuses , indicating lamps etc.5.Contractors shall maintain the installation and make good any defects in workmanship or material within the reasonable time frame NANAAs per maintenance programme As per contractA per contract NANANANANAFFFFFPPPPPFile : ME - 04 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ME -05 ( Page 1 / 1 ) WORK TITLE :Water Tightness between UPVC and R.C Slab APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/10/97WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIATo comply with the specification REFERENCE STANDARDS/ CODES & QUALITY PLAN :NAFACILITIES /INSPECTION INSTRUMENT : Water Test ENVIRNMENT CONTROLS :NANECESSARY RECORDSNA FREQUENCY Every Floor SPECIAL REQUIREMENTS : NASAFETY & HEALTH REQUIREMENTS :Standard PPE WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 1.R.C slab to be casted back with upvc pipe 2.Waterproofing to be applied as per the specification 3.Water ponding test for 24 hours As per the specificationAs per the specificationPut water for visual inspection NARe-applyRe-test CCCPPPFile : ME - 05 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ME -06 ( Page 1 / 1 ) WORK TITLE :Sterillisation of Water Tank APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/10/97WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIATo comply with the specification REFERENCE STANDARDS/ CODES & QUALITY PLAN :To comply with PUB s requirement FACILITIES /INSPECTION INSTRUMENT : NAENVIRNMENT CONTROLS :NANECESSARY RECORDSLaboratory report FREQUENCY Before hand over SPECIAL REQUIREMENTS : NASAFETY & HEALTH REQ
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年中國(guó)涂料用殺菌劑市場(chǎng)調(diào)查研究報(bào)告
- 2025年中國(guó)流水線球市場(chǎng)調(diào)查研究報(bào)告
- 2025年中國(guó)沉水式羅茨鼓風(fēng)機(jī)市場(chǎng)調(diào)查研究報(bào)告
- 2025年中國(guó)氣液壓墻式壓底機(jī)市場(chǎng)調(diào)查研究報(bào)告
- 2025年中國(guó)機(jī)械泡沫滅火器數(shù)據(jù)監(jiān)測(cè)報(bào)告
- 2025年中國(guó)有蓋魚翅碗市場(chǎng)調(diào)查研究報(bào)告
- 2025年中國(guó)無(wú)線尋呼屏市場(chǎng)調(diào)查研究報(bào)告
- 2025年中國(guó)手編鉤線市場(chǎng)調(diào)查研究報(bào)告
- 2025年中國(guó)彩鋼玻璃瓦PU發(fā)泡成型機(jī)數(shù)據(jù)監(jiān)測(cè)研究報(bào)告
- 2025年中國(guó)平面研磨機(jī)市場(chǎng)調(diào)查研究報(bào)告
- 2024年吉林省中考?xì)v史試卷真題(含答案)
- 免檢車輛標(biāo)志委托書
- 人教鄂教版科學(xué)18《制作日晷》課件-科學(xué)四年級(jí)下冊(cè)人教鄂教版
- 員工手冊(cè)民主程序步驟及相應(yīng)簽字文件
- 數(shù)字煉化廠整體解決方案
- 信息安全、網(wǎng)絡(luò)安全和隱私保護(hù)-信息安全控制清單(2024A1-雷澤佳編制)
- (正式版)HGT 20593-2024 鋼制化工設(shè)備焊接與檢驗(yàn)工程技術(shù)規(guī)范
- RFJ 003-2021 人民防空工程防護(hù)設(shè)備產(chǎn)品與安裝質(zhì)量檢測(cè)標(biāo)準(zhǔn)(暫行)
- 養(yǎng)殖場(chǎng)安全培訓(xùn)課件
- 軟件測(cè)試和軟件質(zhì)量保證
- DB61-T 5071-2023 鋼管桁架裝配式預(yù)應(yīng)力混凝土疊合板技術(shù)標(biāo)準(zhǔn)
評(píng)論
0/150
提交評(píng)論