1、四、架橋機拆除施工 Dismantle of Beam Setter五、HES管理措施 HES Management Measures六、環(huán)境保護措施 Environment Protection Measure七、拆除工作安全技術(shù)保證措施 Safety Measure5、梁場施工現(xiàn)場、周邊環(huán)境、設備資源情況;5. Construction site, surrounding environment and equipment allocation. 6、起重設備安裝工程施工驗收規(guī)范、建筑機械使用安全技術(shù)規(guī)程。6. Construction Acceptance Code of Lifting

2、 Equipment Installation; Technical Regulation of Safe Utilization of Constructional Machinery 3、白廟大橋架橋機現(xiàn)已完成主臂的拼裝,但由于整體拼裝完成后不能滿足CDB對機械設備的驗收要求,要求對已經(jīng)架設的架橋機全部拆除,并清運出場。4、已拼裝的架橋機由貝雷梁片拼裝而成,總長約36米,高為3米,寬為3.2米。Assembled beam setter is consisting of multiple pieces of bailey beam. It is approximately 36m in t

3、otal, 3m high and 3.2m wide. 1、白廟大橋架橋機拆除時間計劃在:2011年10月6日2011年10月15日,總計工期15天,全部拆除后統(tǒng)一清運出場。Dismantle time of Baimiao beam setter is planned from 6st Oct 2011 to 15th Oct 2011, namely 15 days in total. All components will be removed from site after such beam setter is fully dismantled. 2、在拆除施工作業(yè)前一天準備好所需

4、的鋼絲繩、卸扣、安全帶、扳手等工具,并逐一檢查是否合格,如有任何問題應立即更換方能使用。Tools such as steel sling, shackle, body harness, spanner and etc shall be prepared and inspected one day prior to dismantling. In case of any problems, tool will be replaced immediately. 3、人員準備 Manpower Allocation 四、架橋機拆除施工 Beam Setter Dismantle 3、 對所有工人進

5、行安全培訓,作業(yè)前必須進行安全技術(shù)交底,做好JSA分析,并確保讓每個作業(yè)人員都了解可能發(fā)生的風險以及風險應對措施。Conduct safety orientation of training to all workers and safety elaboration and JSA shall be conducted prior to work in order to make every person comprehending possible risk and its mitigation measure. 4高處作業(yè)應有合格的梯子提供人員安全上下,拆除忱木、軌道時下方嚴禁立人。Qua

6、lified ladder should be prepared for workers at height to go up and down safely. When workers are working on demolishing the tracks and timber on top of the beams, no one is allowed to stand in such area under beams. 5、需要在貝雷梁上設置生命線,因為工人要到高空作業(yè)拆除天車軌道等工作。Set up life-line on bailey beams for workers who

7、 are going to dismantle crown block track at height. 6、在拆除連接螺栓和卡扣時應先保證吊車就位并已經(jīng)提住貝雷梁以免發(fā)生側(cè)翻造成事故。In consideration that the sequence of the demolishment, the slings should be fixed firmly and the cranes should be positioned properly and also be functioning to hold the beams before removing the connecting

8、 bolts and shackles in order to avoid the bailey beams tip over. 7、前支腿拆除時具有一定危險性,應有專人進行技術(shù)指導并專人監(jiān)護下進行,安全帶始終確保100%掛鉤并提供合理的掛點。Since it is more dangerous to remove the front legs of the beam setter, the dismantling work shall be conducted under technical guidance and supervision and monitor of specific p

9、ersonnel. The hardness must be 100% tied off all the time and tying point shall be reasonable. 8、材料外運車輛必須經(jīng)驗收合格后進入,嚴禁超載、超高,材料捆綁時嚴禁有人站立在材料上進行捆綁工作。 Transporter for transferring dismantled material shall be inspected prior to mobilization. Overload and over-stack is prohibited. No one is allowed to stan

10、d rigged material to conduct any rigging work. 作業(yè)人員應正確的使用安全帶,確保安全生產(chǎn),高空作業(yè)時,必須拴好安全帶。起重吊裝指揮信號應由專門人員指揮,且應明確、準確、哨音應響亮。Lifting shall be under signal of specific personnel and whistle signal shall be clear, accurate and loud. 5、嚴禁超負荷起吊,作業(yè)中防吊車傾覆,危險點應設專人監(jiān)護。Overloaded lifting is prohibited. To prevent tip-over of crane, some danger spots shall be monitored by specific person. 6、所有拆除操作人員須配齊證件

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論