1、Contract TitleShanghai Secco Petrochemicals Company LimitedShanghai Ethylene Cracker ComplexCaojing, Shanghai, P R ChinaDocument TitleENVIRONMENTAL PHILOSOPHYDOCUMENT NUMBERPH-00-TSC-SE-0007A00FOR APPROVALAPPROVEDRM25/06/02JEF25/06/02JEF25/06/02OCE25/06/0202/07/02P01PRELIMINARY FOR SEI REVIEWRM11/04
2、/02P00For CommentPHS14/02/02HNM18/02/02Issue RevIssue or Revision DescriptionOrigin byDateCheck byDateApprovebyDateApprove byDateThis Document is Owned byRay Martin (RM)Oo Chwee Er (OCE)IPMT AuthorityHARD COPIES ARE UNCONTROLLEDENVIRONMENTAL PHILOSOPHYTABLE OF CONTENTS1.0INTRODUCTION1.1General1.2Des
3、cription Of Facility1.3Integrated Project Management Team (Ipmt) Strategy1.4Life Cycle Costs1.5Standards And Regulations1.6Reference Documents2.0SCOPE OF WORK2.1General3.0ENVIRONMENTAL PHILOSOPHY4.0MANAGEMENT OF THE ENVIRONMENTAL POLICY5.0BASIS OF DESIGN6.0BASELINE ENVIRONMENTAL CONDITIONS7.0EMISSIO
4、NS7.1Waste Water And Liquid Effluent7.1.1Maintaining Soil and Ground Water Integrity7.1.2Storm Water7.1.3Fire Water & Waste Water7.2Solid Residues7.3Sanitary Waste7.4Waste Gasses & Air Quality7.5Noise1.0 INTRODUCTION1.1 GeneralThe purpose of this document is to set out the methodology of Environment
5、al Standards & Assurance Strategy approach for the whole of the SECCO facility. The document has been developed in order to create a global cross-discipline guide for the development of the process derivatives plants and offsites involved in this project. The Strategy shall be used as a guide by all
6、 parties involved in this development and as such will be subject of input from all concerned. It will be arranged as a support for the Shanghai Secco Petrochemical Company Ltd, SECCO IPMT and Chinese Legislative requirements to ensure that the design process incorporates the best available practice
7、 with the optimisation of resource and cost.As a link to the responsibilities of the Operator, Shanghai Secco Petrochemical Company Ltd an Integrated Project Management Team (IPMT) has been established to manage the Shanghai Ethylene Cracker Complex (SECCO) project and its engineering contractors.Th
8、e document links the hazard assessment requirements, and any Environmental Standards & Assurance Strategy process, to the design development by ensuring that reliable and effective safety and emergency systems are incorporated. This will provide an overall system, which will help to minimise the los
9、s of life, production, capital investment and damage to the environment should an accidental event occur.This document while providing the basic safety design guidelines for the Project does not attempt to cover in detail every aspect of safety design. Reference should be made therefore, to specific
10、 discipline philosophies and specifications as appropriate. The strategy does not relieve personnel of Shanghai Secco Petrochemical Company Ltd. SECCO IPMT, the Main Engineering Contractors and their sub-contractors and Suppliers from their responsibilities for the safe development of the design und
11、er current applicable legislative requirements pertaining to the development. 1.2 Description Of FacilityShanghai Secco Petrochemical Company Limited, as Operator, has been formed to build an internationally competitive, world scale, integrated petrochemical complex to manufacture chemical products
12、safely within an ethylene cracker complex. To this end the design and construction is being carried out by Joint Venture Partners BP Amoco, SINOPEC and SPC as part of the Shanghai Ethylene Cracker Complex Integrated Project Management Team ( SECCO IPMT ). The headquarters of Shanghai Secco Petrochem
13、ical Company Limited is located in Jinshan whilst the headquarters of the SECCO IPMT is in central Shanghai city.The project site is located within Shanghai Chemical Industry Park (SCIP) at Caojing, P R China. SCIP lies on the northern bank of Hangzhou Bay, on the boundary of Jinshan area and Fengxi
14、an county. The western part of the SCIP site faces Caojin in Jinshan and eastern part faces Huqiao town and Tuolin town of Fengxiao county. SCIP is 50km away from Shanghai city and 12km away from Sinopec SPC, Jinshan. The total area of the SCIP site to be eventually developed covers 23.4 Km2, of whi
15、ch a plot area of 9.77 Km2 has been allocated for SECCO project. The area reserved for the ethylene cracker on complex comprises blocks A1, A2, A3 and B1.The SCIP site is based upon reclaimed land, largely undeveloped, held secure from the sea by a sea wall with a series of managed dykes and a canal
16、 inside. A road system is in place within the SCIP site to access the varying plots for development and a rail line will also be brought in. SECCO product will be exported by pipeline, either via tankage direct to the end user or by a 3rd party operated jetty for tanker loading. Similarly raw materi
17、als for the process will be brought in by external pipeline or via the jetty.The Development Plan for SECCO Project envisages three phases of development; Process Design Package (PDP) and Basic Engineering (BE), Detail Engineering (DE), Procurement ( P ) and Construction, Commissioning (CC) and Hand
18、 Over.The SECCO development is split into the following engineering/procurement packages; Olefins, (Licensor - Lummus, BASF & Sinotec) Ethylene Unit (ETU) Gasoline Treatment Unit (GTU) Olefins Conversion Unit (OCU) Butadiene (BEP) Common Facilities Styrenics, (Licensor - Lummus & BP) PS Train 1 (PS1
19、) PS Train 2 (PS2) PS Train 3 (PS3) Common Facilities Polyolefins, (Licensor BP) PE Train 1 (PE1) PE Train 2 (PE2) PP Train 1 (PP1) Common Facilities Acrylonitrile (AN), (Licensor BP) Common Facilities Methyl Methacrylate (MMA) (Licensor Inneos) HOLD Common Facilities OSBL, Outside Battery Limits,Ea
20、ch of the downstream facilities will be constructed under several main contractors who have specialist expertise in the particular plant complexity.The Secco facility covers several different sites and will in the future be extended and developed for additional facilities. It is not the intention, w
21、ithin the scope of the current project, to facilitate the further development of the Fire and Gas Detection services for future new plant areas. This should be further reviewed in light of locations of possible new plant areas on SECCO facililities.1.3 Integrated Project Management Team (Ipmt) Strat
22、egyThe IPMT strategy for Quantitive Risk Assessment shall be is to develop, within a Health, Safety and Environmental background, a philosophy, incorporating standards and specifications in order that a common and uniform approach is adopted to ensure across the plot standardisation. By adopting a c
23、ommon standard it is intended to create a situation where facilities are, assessed, engineered and supplied/installed on a uniform basis and hence negate a situation which has arrived at a differing engineering solution and differing component parts.1.4 Life Cycle CostsRefer to Life Cycle Cost Evalu
24、ation The projected life of the Petrochemical Complex including the Offsites Utilities is given as 25 years. Any equipment, therefore, referenced within this philosophy should meet this requirement and be guaranteed for this time period notwithstanding misuse, non-maintenance etc. For this purpose a
25、ny recommendations regarding the type of use of equipment and the choice of materials used should be taken into consideration. Where practical savings may be made, along with ease of use, by using off-the-shelf equipment that may require replacement before this period of time, then this shall be adv
26、ised and approved by the SECCO Integrated Project Management Team (IPMT).1.5 Standards And RegulationsThe SECCO Project shall satisfy all the relevant Peoples Republic of China (PRC) Acts and Regulations and legislation detailed in Sections 3.0 and 4.0.1.6 Reference DocumentsConcept Safety Evaluatio
27、n ReportRE-00-TSC-SE-0001Technical HSE PlanPL-00-TSC-SE-0001Hazardous Area Classification PhilosophyPH-00-TSC-SE-0001Plant Layout PhilosophyPH-00-TSC-PP-0001General Site Information: Meteorological,SP-00-TSC-PR-0001Geological & Utilities DataEnvironmental PhilosophyPH-00-TSC-SE-00072.0 INTRODUCTION2
28、.1 GeneralThe purpose of this document is to set out the methodology of Environmental Philosophy approach for the whole of the SECCO facility. The document has been developed in order to create a global cross-discipline guide for the development of the process derivatives plants and offsites involve
29、d in this project. The Philosophy shall be used as a guide by all parties involved in this development and as such will be subject of input from all concerned. It will be arranged as a support for the Shanghai Secco Petrochemical Company Ltd, SECCO IPMT and Chinese Legislative requirements to ensure
30、 that the design process incorporates the best available practice with the optimisation of resource and cost.As a link to the responsibilities of the Operator, Shanghai Secco Petrochemical Company Ltd an Integrated Project Management Team (IPMT) has been established to manage the Shanghai Ethylene C
31、racker Complex (SECCO) project and its engineering contractors.The document links the hazard assessment requirements, and any Environmental Philosophy process, to the design development by ensuring that reliable and effective safety and emergency systems are incorporated. This will provide an overal
32、l system, which will help to minimise the loss of life, production, capital investment and damage to the environment should an accidental event occur.This document while providing the basic safety design guidelines for the Project does not attempt to cover in detail every aspect of safety design. Re
33、ference should be made therefore, to specific discipline philosophies and specifications as appropriate. The philosophy does not relieve personnel of Shanghai Secco Petrochemical Company Ltd. SECCO IPMT, the Main Engineering Contractors and their sub-contractors and Suppliers from their responsibili
34、ties for the safe development of the design under current applicable legislative requirements pertaining to the development. 2.2 Description Of FacilityShanghai Secco Petrochemical Company Limited, as Operator, has been formed to build an internationally competitive, world scale, integrated petroche
35、mical complex to manufacture chemical products safely within an ethylene cracker complex. To this end the design and construction is being carried out by Joint Venture Partners BP Amoco, SINOPEC and SPC as part of the Shanghai Ethylene Cracker Complex Integrated Project Management Team ( SECCO IPMT
36、). The headquarters of Shanghai Secco Petrochemical Company Limited is located in Jinshan whilst the headquarters of the SECCO IPMT is in central Shanghai city.The project site is located within Shanghai Chemical Industry Park (SCIP) at Caojing, P R China. SCIP lies on the northern bank of Hangzhou
37、Bay, on the boundary of Jinshan area and Fengxian county. The western part of the SCIP site faces Caojin in Jinshan and eastern part faces Huqiao town and Tuolin town of Fengxiao county. SCIP is 50km away from Shanghai city and 12km away from Sinopec SPC, Jinshan. The total area of the SCIP site to
38、be eventually developed covers 23.4 Km2, of which a plot area of 9.77 Km2 has been allocated for SECCO project. The area reserved for the ethylene cracker on complex comprises blocks A1, A2, A3 and B1.The SCIP site is based upon reclaimed land, largely undeveloped, held secure from the sea by a sea
39、wall with a series of managed dykes and a canal inside. A road system is in place within the SCIP site to access the varying plots for development and a rail line will also be brought in. SECCO product will be exported by pipeline, either via tankage direct to the end user or by a 3rd party operated
40、 jetty for tanker loading. Similarly raw materials for the process will be brought in by external pipeline or via the jetty.The Development Plan for SECCO Project envisages three phases of development; Process Design Package (PDP) and Basic Engineering (BE), Detail Engineering (DE), Procurement ( P
41、) and Construction, Commissioning (CC) and Hand Over.The SECCO development is split into the following engineering/procurement packages; Olefins, (Licensor - Lummus, BASF & Sinotec) Ethylene Unit (ETU) Gasoline Treatment Unit (GTU) Olefins Conversion Unit (OCU) Butadiene (BEP) Common Facilities Styr
42、enics, (Licensor - Lummus & BP) PS Train 1 (PS1) PS Train 2 (PS2) PS Train 3 (PS3) Common Facilities Polyolefins, (Licensor BP) PE Train 1 (PE1) PE Train 2 (PE2) PP Train 1 (PP1) Common Facilities Acrylonitrile (AN), (Licensor BP) Common Facilities Methyl Methacrylate (MMA) (Licensor Inneos) HOLD Co
43、mmon Facilities OSBL, Outside Battery Limits,Each of the downstream facilities will be constructed under several main contractors who have specialist expertise in the particular plant complexity.The Secco facility covers several different sites and will in the future be extended and developed for ad
44、ditional facilities. It is not the intention, within the scope of the current project, to facilitate the further development of the Fire and Gas Detection services for future new plant areas. This should be further reviewed in light of locations of possible new plant areas on SECCO facililities.2.3
45、Integrated Project Management Team (Ipmt) StrategyThe IPMT strategy for Quantitive Risk Assessment shall be is to develop, within a Health, Safety and Environmental background, a philosophy, incorporating standards and specifications in order that a common and uniform approach is adopted to ensure a
46、cross the plot standardisation. By adopting a common standard it is intended to create a situation where facilities are, assessed, engineered and supplied/installed on a uniform basis and hence negate a situation which has arrived at a differing engineering solution and differing component parts.2.4
47、 Life Cycle CostsRefer to Life Cycle Cost Evaluation The projected life of the Petrochemical Complex including the Offsites Utilities is given as 205 years. Any equipment, therefore, referenced within this philosophy should meet this requirement and be guaranteed for this time period notwithstanding
48、 misuse, non-maintenance etc. For this purpose any recommendations regarding the type of use of equipment and the choice of materials used should be taken into consideration. Where practical savings may be made, along with ease of use, by using off-the-shelf equipment that may require replacement be
49、fore this period of time, then this shall be advised and approved by the SECCO Integrated Project Management Team (IPMT).2.5 Standards And RegulationsThe SECCO Project shall satisfy all the relevant Peoples Republic of China (PRC) Acts and Regulations.2.6 Reference DocumentsConcept Safety Evaluation
50、 ReportRE-00-TSC-SE-0001Technical HSE PlanPL-00-TSC-SE-0001Hazardous Area Classification PhilosophyPH-00-TSC-SE-0001Plant Layout PhilosophyPH-00-TSC-PP-0001General Site Information: Meteorological,SP-00-TSC-PR-0001Geological & Utilities DataEnvironmental Standards & AssurancePHSE-00-TSC-SE-0001Strat
51、egy.3.0 SCOPE OF WORK3.1 GeneralThe Environmental Philosophypreparedfor theSECCO Project to assess the consequences of identified major hazards particularly, those which could result in harm to people and or the environment. The Environmental Management System is to be based on the updated approved
52、for design (AFD) information for each part of the project.4.0 ENVIRONMENTAL PHILOSOPHYThe purpose of this document is to help provide the outline philosophies and guidance on satisfying the requirements of the policy throughout the design and operation of the various process plants and utility facil
53、ities.on satisfying the corporate goal of no damage to the environment in the most cost effective manor. SECCO will, by developing baseline environmental conditions and using a zero damage base case, apply processes that will lead to the optimal development concept. This will take into account speci
54、fic conditions, such as: the scope of the operation, local environment, applicable legislation and commitments, public perception and JV partner buy-in. SECCO embraces the following philosophies to achieve the environmental goals of sound design, construction, commissioning and operation:-We will us
55、e best available practical technology and management control techniques to design, construct, commission and operate the facilities to established international and national legislation, codes and standards for environmental performance.Where variations from the specific goals of no damage to the en
56、vironment are proposed, a stringent, reviewed, justification process will be demonstrated quantifying expected damage levels. Where environmental damage cannot be eliminated, systems for managing by-product or emission streams through mitigation and remediation will be developed using the following
57、priorities: Recover, recycle, reuse. Sell as a byproduct to facilities that can effectively reclaim and use the material. Use unsaleable or unusable hydrocarbon streams as fuel. Hydrocarbon wastes liquids and gases that cannot be used as fuel will be disposed of by controlled incineration. All other wastes which cannot be eliminated by design will be disposed of without damage to the environment. Waste treatment facilities will be designed and operated to ensure effl
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 軟件設(shè)計師考前必知要點(diǎn)試題及答案
- 變革管理在戰(zhàn)略中的作用試題及答案
- 2025屆安徽省南陵縣聯(lián)考七下數(shù)學(xué)期末考試試題含解析
- 軟件設(shè)計師經(jīng)典考題及答案解析
- 網(wǎng)絡(luò)管理員職業(yè)發(fā)展map試題及答案
- 2025屆廣東省肇慶市封開縣數(shù)學(xué)七下期末質(zhì)量跟蹤監(jiān)視模擬試題含解析
- 網(wǎng)絡(luò)流量優(yōu)化方案試題及答案
- 2025年中國錫基合金錠市場調(diào)查研究報告
- 2025年中國鍋爐風(fēng)煙系統(tǒng)執(zhí)行器市場調(diào)查研究報告
- 軟件設(shè)計師考試應(yīng)試技巧大解析試題及答案
- 電商家具用戶體驗(yàn)研究-深度研究
- iata第 66版危險貨物規(guī)則(dgr 66th)
- 高考英語單詞3500(亂序版)
- 兒童化妝品安全知識科普
- 6-農(nóng)產(chǎn)品營銷-農(nóng)產(chǎn)品品牌策略
- 肺癌的護(hù)理查房 課件
- 消防工程施工中的質(zhì)量控制
- 2025年云南迪慶新華書店有限公司招聘筆試參考題庫含答案解析
- 【大學(xué)課件】單片機(jī)的基本結(jié)構(gòu)
- 醫(yī)療糾紛處理承諾書
- 辦理個人車稅委托書模板
評論
0/150
提交評論