



免費預(yù)覽已結(jié)束,剩余1頁可下載查看
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
先進(jìn)鑄造技術(shù)英文論文翻譯姓名:王鵬飛 學(xué)號:0905010117 指導(dǎo)教師:杜曉明 論文出處:Journal of Materials Processing Technology(材料加工技術(shù)雜志)文章題目:Development of a device for dynamical measurement of the load on casting and the contraction of the casting in a sand mold during cooling譯:鑄件負(fù)載動態(tài)測量設(shè)備的研發(fā)以及冷卻冷卻過程間鑄件在砂型中的收縮作者及機構(gòu):John A. ROGERS University of Illinois Urbana-CampaignTo predict and control the residual stress present in sand casting manufactured via CAE (Computer Aided Engineering), the mechanical interaction between the casting and the sand mold during cooling must be determined experimentally. A device was developed in this study to determine the load on the casting caused by the resistance of the mold and the contraction of the casting during cooling. Our device consists of two modules that work simultaneously: a module containing a load cell, for measuring the load on the casting during cooling and a module containing an LVDT (Linear Variable Differential Transformer) for measuring the contraction of the casting during cooling. In performance verification testing, the device enabled the simultaneous measurement of the load on the sand casting and the contraction of the casting. This measurement was performed dynamically during the cooling process. Additionally, for the case where the contraction of the casting was hindered by the sand mold, the permanent deformation of the casting after shake out (which leads to residual stress in the casting) was successfully measured using our device摘要通過CAE(計算機輔助工程)來預(yù)測和控制出現(xiàn)在砂型鑄造生產(chǎn)機械互動中的殘余應(yīng)力以及冷卻過程中實驗所決定的鑄件和砂型間的機械互動。一件設(shè)備在一項研究中被開發(fā)出來,所謂這項研究就是在冷卻過程中確定由模具阻力和鑄件收縮引起的鑄件負(fù)載。我們的設(shè)備由同時工作的兩個模塊組成:一個模塊包含一個負(fù)載細(xì)胞,這是用來測量冷卻過程中鑄件的負(fù)載。另一個模塊包含一個LVDT(線性差動變壓器),用來測量冷卻過程中鑄件的收縮。在性能驗證測試中,該設(shè)備能夠同時測量鑄件負(fù)載和鑄件收縮。這項測試是在動態(tài)下的冷卻過程中執(zhí)行的。此外,根據(jù)砂型阻礙鑄件收縮的情況,清理后的鑄件其永久變形(鑄造中導(dǎo)致了殘余應(yīng)力)被我們的設(shè)備成功測量出來。Keywords(關(guān)鍵詞) Sand mold; 砂型 Sand casting; 砂型鑄造 Residual stress; 殘余應(yīng)力 Distortion; 失真 CAE; 計算機輔助工程 Aluminum alloy;鋁合金1. Introduction(介紹)1) Temperature difference within a casting during cooling冷卻過程中鑄件內(nèi)的溫差 2) Sand mold restraint on the contraction of the casting during cooling冷卻過程中關(guān)于鑄件收縮的砂型限制 3) Phase transformations in the solid state during cooling冷卻過程中的固態(tài)相變 2. Experimental device(實驗設(shè)備) 2.1. Outline of the device(設(shè)備概要)2.2. Module for measuring the load on the casting during cooling (冷卻過程中測量鑄件負(fù)載的模塊)2.3. Module for measuring the contraction of the casting during cooling (冷卻過程中測量鑄件收縮的模塊)2.4. Critical issues(關(guān)鍵問題)2.4.1. Avoiding the restraint due to the sand between the sprue and the metal molding box(避免澆口和金屬型箱體間型砂的約束)2.4.2. Avoiding a load caused by thermal expansion of the cast part after pouring(避免澆注后由于鑄件部分熱膨脹引起的負(fù)載)3. Testing the device(測試設(shè)備)4. Results and discussion(結(jié)果與討論)4.1. Results of the dynamical measurement of the load on the casting and the contraction of the casting during cooling(冷卻過程中鑄件負(fù)載和鑄件收縮的動態(tài)測量結(jié)果)4.2. Measuring the permanent deformation of the casting after shake out (鑄件清理后后其永久變形的測量)4.2.1. Method for measuring the permanent deformation (測量永久變形的方法)4.2.2. Total contraction without permanent deformation (contraction of the flangeless casting cast in green sand mold) (沒有永久變形的總收縮濕砂型中無凸緣鑄件的收縮)4.2.3. Total contraction of the casting that had received a restraining force from the sand mold (受到砂型約束力鑄件的總收縮)5. ConclusionsIn previous studies of the restraint due to a sand mold on the contraction of a casting during cooling, only the contraction of the sand casting was examined. In particular, neither the static load on the casting just before the shake out nor the dynamical load on the casting during cooling was measured. Therefore, a device was developed in this study to determine the mechanical interaction between the casting and the sand mold during cooling. Our conclusions regarding this device are summarized as follows. 1.The developed device enables the simultaneous and dynamical measurment of the load on the casting and the contraction of the casting during cooling2. The permanent deformation of the casting after shake out was successfully measured with a precision of 93m.結(jié)論以前的約束
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 公司游樂園活動方案
- 公司新年酒會策劃方案
- 公司組織爬山策劃方案
- 公司游艇商務(wù)活動方案
- 公司文化集市策劃方案
- 公司綠色騎行活動方案
- 公司新年同樂會活動方案
- 公司母親節(jié)福利活動方案
- 公司消防日活動方案
- 公司線上交流活動方案
- 江蘇省揚州市2023-2024學(xué)年高一下學(xué)期6月期末 英語試卷(含答案無聽力)
- 2025年安慶望江縣融媒體中心專業(yè)技術(shù)人員招聘考試筆試試題(含答案)
- 浙江省溫州市樂清市2022-2023學(xué)年五年級下學(xué)期6月期末科學(xué)試題
- 2025年中國城市禮物發(fā)展白皮書
- 2024年陜西省西安市初中學(xué)業(yè)水平模擬考試地理試卷
- 口腔門診放射管理制度
- cpsm考試試題及答案
- 匯川技術(shù)高壓變頻器技術(shù)標(biāo)準(zhǔn)教材
- 2025年玻璃鋼圍網(wǎng)漁船項目市場調(diào)查研究報告
- 完整版新修訂《厲行節(jié)約反對浪費條例》(課件)
- 廣東省東莞市2025屆九年級下學(xué)期中考二模地理試卷(含答案)
評論
0/150
提交評論