



下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、Project Quality Management includes the processes required to ensure that the project will satisfy the needs for which it was undertaken. It includes “all activities of the overall management function that determine the quality policy, objectives, and responsibilities and implements them by means su
2、ch as quality planning, quality control, quality assurance, and quality improvement, within the quality system”. Figure 8-l provides an overview of the following major project quality management processes:項(xiàng)目質(zhì)量管理包括項(xiàng)目滿足其需求所需的過程。它包括“確定質(zhì)量方針、目標(biāo)和職責(zé)并在質(zhì)量體系中通過諸如質(zhì)量計(jì)劃、質(zhì)量保證和質(zhì)量改進(jìn)等方法實(shí)施的整個(gè)管理職能的全部活動”。圖8-1為項(xiàng)目質(zhì)量管理過程提
3、供了一個(gè)概述:8.l Quality Planningidentifying which quality standards are relevant to the project and determining how to satisfy them.質(zhì)量計(jì)劃確定項(xiàng)目相關(guān)的質(zhì)量標(biāo)準(zhǔn)并決定如何滿足它們。8.2 Quality Assuranceevaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant qual
4、ity standards.質(zhì)量保證定期評價(jià)整個(gè)項(xiàng)目的執(zhí)行情況,提供項(xiàng)目滿足相關(guān)質(zhì)量標(biāo)準(zhǔn)的信心。8.3 Quality Controlmonitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance.質(zhì)量控制監(jiān)控具體的項(xiàng)目結(jié)果,確定其是否滿足相關(guān)的質(zhì)量標(biāo)準(zhǔn),確定消除導(dǎo)致不滿意執(zhí)行情況原因的方法。 These processes i
5、nteract with each other and with the processes in the other knowledge areas as well. Each process may involve effort from one or more individuals or groups of individuals based on the needs of the project. Each process generally occurs at least once in every project phase.這些過程相互之間以及同其它知識領(lǐng)域的過程交互作用。每個(gè)
6、過程包含了基于項(xiàng)目需求的個(gè)人或集體的努力。每個(gè)過程在每個(gè)項(xiàng)目階段一般至少發(fā)生一次。Although the processes are presented here as discrete elements with well-defined interfaces, in practice they may overlap and interact in ways not detailed here. Process interactions are discussed 1n detail in Chapter 3, Project Management Processes.盡管這里描述的過程
7、有定義很好的接口,并且是獨(dú)立、離散的要素,實(shí)際上它們以這里未描述的方式重疊和交互作用。第3章中詳細(xì)討論過程的交互作用。The basic approach to quality management described in this section is intended to be compatible with that of the international Organization for Standardization (ISO) as detailed in the ISO 9000 and 10000 series of standards and guidelines. T
8、his generalized approach should also be compatible with (a) proprietary approaches to quality management such as those recommended by Deming, Juran, Crosby, and others, and (b) non-proprietary approaches such as Total Quality Management (TQM), Continuous Improvement, and others.本部分描述的質(zhì)量管理的基本方法同國際標(biāo)準(zhǔn)化
9、組織(ISO)的兼容,后者以ISO9000和10000系列標(biāo)準(zhǔn)和指南形式祥述。這個(gè)普遍的方法同樣也兼容于(a)質(zhì)量管理的專利方法,例如Deming, Juran, Crosby以及其它人推薦的一些方法,(b)非專利方法,例如全面質(zhì)量管理(TQM)、持續(xù)改進(jìn)等。Project quality management must address both the management of the project and the product of the project. Failure to meet quality requirements in either dimension can ha
10、ve serious negative consequences for any or all of the project Stakeholders. For example:項(xiàng)目質(zhì)量管理必須涉及項(xiàng)目管理和項(xiàng)目產(chǎn)品這兩個(gè)部分。如任何一個(gè)沒有滿足項(xiàng)目利害關(guān)系者的要求均會造成嚴(yán)重的消極后果。例如:· Meeting customer requirements by overworking the project team may produce negative consequences in the form of increased employee turnover.通過讓項(xiàng)目隊(duì)
11、伍加班來達(dá)到顧客要求可能以增加雇員更新的形式產(chǎn)生消極后果。· Meeting project schedule objectives by rushing planned quality inspections may produce negative consequences when errors go undetected.通過使用計(jì)劃的突擊質(zhì)量檢查方式來達(dá)到項(xiàng)目進(jìn)度目標(biāo)可能在錯誤沒有被發(fā)現(xiàn)的情況下產(chǎn)生消極后果。 Quality is “the totality of characteristics of an entity that bear on its ability t
12、o satisfy stated or implied needs”. A critical aspect of quality management in the project context is the necessity to turn implied needs into stated needs through project scope management, which is described in Chapter 5.質(zhì)量是:“反映一個(gè)實(shí)體滿足明確和隱含需要能力的特征的總和”。在項(xiàng)目領(lǐng)域內(nèi),質(zhì)量項(xiàng)目的一個(gè)關(guān)鍵方面是通過項(xiàng)目范圍管理(第5章)把隱含的需要轉(zhuǎn)變?yōu)槊鞔_的需要。T
13、he project management team must be careful not to confuse qua1ity with grade. Grade is “a category or rank given to cntities having the same functional use but different requirements for quality”. Low quality is always a problem; low grade may not be. For example, a software product may be of high q
14、uality (no obvious bugs, readable manual) and low grade (a limited number of features), or of low quality (many bugs, poorly organized user documentation) and high grade (numerous features). Determining and delivering the required levels of both quality and grade are the responsibilities of the proj
15、ect manager and the project management team.項(xiàng)目管理隊(duì)伍必須注意不能將質(zhì)量同等級混淆。等級是“對功能用途相同但質(zhì)量要求不同的實(shí)體所作的分類和排序”。質(zhì)量低常成為一個(gè)問題,但等級低則不是。例如,一個(gè)軟件產(chǎn)品可能是高質(zhì)量(無明顯錯誤,可讀性好的用戶手冊)和低等級的(有限的功能),或者低質(zhì)量(有許多錯誤,組織得很差的用戶手冊)和高等級的(許多功能)。確定和傳達(dá)所需的質(zhì)量及等級水平是項(xiàng)目經(jīng)理和項(xiàng)目管理隊(duì)伍的責(zé)任。相關(guān)圖片如下此主題相關(guān)圖片如下:Figure 8-1 Project Quality Management OverviewThe project
16、management team should also be aware that modern quality management complements modern project management. For example, both disciplines recognize the importance of:項(xiàng)目管理隊(duì)伍同樣必須清晰現(xiàn)代質(zhì)量管理是對現(xiàn)代項(xiàng)目管理的補(bǔ)充,兩者均承認(rèn)下面內(nèi)容的重要性:· Customer satisfactionunderstanding, managing, and influencing needs so that customer
17、 expectations are met or exceeded. This requires a combination of conformance to specifications (the project must produce what it said it wou1d produce) and fitness for use (the product or service produced must satisfy real needs).顧客滿意理解、管理和影響需求從而達(dá)到或超過顧客的期望。這需要符合規(guī)范(項(xiàng)目必須生產(chǎn)出其承諾的產(chǎn)品)和適合使用(產(chǎn)品或服務(wù)必須滿足實(shí)際需要)
18、的組合。· Prevention over inspectionthe cost of avoiding mistakes is always much less than the cost of correcting them.防止跳過檢查避免錯誤的費(fèi)用總是大大小于糾正錯誤的費(fèi)用。· Management responsibilitysuccess requires the participation of all members of the team, but it remains the responsibility of management to provide
19、 the resources needed to succeed.管理職責(zé)成功需要隊(duì)伍所有成員的參與,但提供成功所需資源是管理的職責(zé)。· Processes within phasesthe repeated plan-do-check-act cycle described by Deming and others is highly similar to the combination of phases and processes discussed in Chapter 3, Project Management Processes.階段內(nèi)過程Deming描述的“計(jì)劃-執(zhí)行-檢查-措施”(PDCA)循環(huán)以及類似于第3章(項(xiàng)目管理過程)描述的階段和過程的組合。 In addition, quality improvement initiatives undertaken by the perform
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025-2030凍干貓糧行業(yè)市場發(fā)展分析及投資前景研究報(bào)告
- 2025-2030全球及中國銀納米漿料行業(yè)市場現(xiàn)狀供需分析及市場深度研究發(fā)展前景及規(guī)劃可行性分析研究報(bào)告
- 烏蘭察布市察哈爾經(jīng)濟(jì)技術(shù)開發(fā)區(qū)氧氣、乙炔加工項(xiàng)目可行性研究報(bào)告
- 石灰豎窯可行性研究報(bào)告
- 2025-2030全球及中國攝像機(jī)遙控器行業(yè)市場現(xiàn)狀供需分析及市場深度研究發(fā)展前景及規(guī)劃可行性分析研究報(bào)告
- 瀝青混凝土拌合站可行性研究報(bào)告
- 華東師范大學(xué)《三維動畫與特效》2023-2024學(xué)年第一學(xué)期期末試卷
- 福建省福州市教育院第二附屬中學(xué)2024年化學(xué)九上期末調(diào)研試題含解析
- 石家莊經(jīng)濟(jì)職業(yè)學(xué)院《生物醫(yī)藥與新材料化工科研創(chuàng)新訓(xùn)練》2023-2024學(xué)年第一學(xué)期期末試卷
- 延安大學(xué)西安創(chuàng)新學(xué)院《醫(yī)學(xué)細(xì)胞生物學(xué)和遺傳學(xué)》2023-2024學(xué)年第一學(xué)期期末試卷
- 緩和醫(yī)療與護(hù)理課件
- 企業(yè)消防安全責(zé)任制模板
- 《工程勘察設(shè)計(jì)收費(fèi)標(biāo)準(zhǔn)》(2002年修訂本)
- TCGMA0330012018壓縮空氣站能效分級指南
- 電極檢驗(yàn)標(biāo)準(zhǔn)
- 00312政治學(xué)概論-重點(diǎn)筆記-串講內(nèi)容-自考
- 戰(zhàn)略定位與企業(yè)核心競爭力課件
- 授權(quán)簽字人考試參閱題-附答案
- DB14-T 2550-2022廚房食品切配用具顏色標(biāo)識指南
- 保潔人員地面清潔標(biāo)準(zhǔn)作業(yè)規(guī)程
- 99S203消防水泵接合器安裝圖集
評論
0/150
提交評論